Please use this identifier to cite or link to this item: http://umt-ir.umt.edu.my:8080/handle/123456789/10826
Full metadata record
DC FieldValueLanguage
dc.contributor.authorLow Wai Ming-
dc.date.accessioned2018-11-26T06:52:04Z-
dc.date.available2018-11-26T06:52:04Z-
dc.date.issued2012-
dc.identifier.urihttp://umt-ir.umt.edu.my:8080/xmlui/handle/123456789/10826-
dc.description.abstractThe performance of the quay crane plays a great role in the productivity and efficiency of the container terminal. The performance of the quay crane influences the vessel turnaround time and the container throughput of the port. In addition, crane operator is an important element for the performance of the quay crane. Breakdown of the crane is inevitable but the seriousness of the issue can be mitigated or reduced. This study enhances a better understanding on how the performance of the container quay crane in affecting the port operation. The identification of the elements or events that contributed to the crane breakdown may provide a general insight to the future crane maintenance management. Moreover, this research provides recommended preventions for the undesirable future incident. This paper discusses the two different ways of quay crane managements of Northport and Westport both in working or breakdown situation. This paper presents the result of study on the performance and management of quay cranes from Northport and Westport.en_US
dc.language.isoenen_US
dc.publisherUniversiti Malaysia Terengganuen_US
dc.subjectLow Wai Mingen_US
dc.subjectLP 8 FMSM 1 2012en_US
dc.titleContainer quay crane : performance and managementen_US
dc.typeWorking Paperen_US
Appears in Collections:Fakulti Pengajian Maritim dan Sains Marin

Files in This Item:
File Description SizeFormat 
LP 8 FMSM 1 2012 Full text.pdf
  Restricted Access
3.72 MBAdobe PDFView/Open Request a copy
LP 8 FMSM 1 2012 Abstract.pdf321.52 kBAdobe PDFView/Open


Items in UMT-IR are protected by copyright, with all rights reserved, unless otherwise indicated.